Building Permit Drawings Rejected? 10 Costly Mistakes Ontario Homeowners Make
The ten reasons permit applications most often come back with comments in Ontario, what each one looks like in practice, and how to avoid it before you submit.

Having building permit drawings come back with comments is more than an annoyance. It costs contractor time, pushes work into worse weather, and can mean re-application fees. Most of the reasons are predictable, and most are avoidable.
It is worth knowing what is at stake. Under the Building Code Act, 1992, section 36, a person convicted of an offence is liable to a fine of up to $50,000 for a first offence and up to $100,000 for a subsequent offence. For a corporation the maximums are $500,000 and $1,500,000. A municipality can also order work to be removed or brought into compliance at the owner’s expense.
1. Not Getting a Permit at All
The most expensive mistake is skipping the process. Some owners assume small work is exempt; others hope to save the fee.
It usually surfaces later, most often during a sale. Resolving unpermitted work generally means applying for a permit after the fact and bringing the work up to current requirements, which can mean opening up finished construction. If you are buying, ask whether past work was permitted. See retroactive building permits.
2. Submitting an Incomplete Application
Incomplete applications are among the most common reasons for an immediate return. Unanswered questions on the form, missing signatures, absent documents, a vague description of the work.
This matters more than it looks. The Building Code gives the chief building official a fixed period to issue or refuse a permit, counted in business days, but that period only starts once the application is complete as the Code defines it: the prescribed form, an eligible applicant, every applicable field and required schedule completed and submitted, and the required fees paid (Division C, Article 1.3.1.3). An incomplete submission does not start the clock, so a missing signature can cost you weeks before anyone has looked at the drawings.
Work from a checklist built on your own municipality’s requirements, or use a permit services provider who does this routinely.

3. Missing Technical Detail
Many owner-prepared drawings show the layout but not how the building goes together. Details commonly missing include:
- Structural framing and how loads are carried down
- Foundation details and drainage
- Insulation and effective thermal resistance values
- Fire separations and their ratings
- Window sizes, including bedroom egress
- Natural light and ventilation where required
Without them a reviewer cannot confirm compliance, and the application comes back.
4. Drawings That Do Not Match Reality
Drawings must represent what will actually be built on the actual site. Frequent problems:
- Property dimensions or setbacks that do not match the survey
- Incorrect ceiling heights or floor levels
- Existing conditions drawn from memory rather than measured
- Sheets that contradict each other
Measuring the existing building properly, or working from a current survey, avoids most of this. See technical drafting.
5. Not Meeting Code Requirements
The Ontario Building Code is a large and detailed document. Common failures include:
- Egress windows in bedrooms that are undersized
- Missing or inadequate fire separation between units
- Undersized beams, lintels or posts
- Ventilation that does not meet requirements
Confirm that whoever prepares your drawings holds a current registration in a category that covers your building. You can check this yourself in the QuARTS Public Search Registry.
6. Leaving Out Mechanical and Structural Information
Reviewers need to understand how the project is built, not only what it looks like. That usually means:
- Foundation design
- Roof and floor framing
- HVAC design and duct layouts where required
- Plumbing and electrical rough-in information
- Structural connections
Where a project needs an engineer, it needs one before submission, not after a comment arrives. See do you work with engineers.

7. Misunderstanding Who Signs What
Drawings carry the information of the person responsible for them. A registered designer’s BCIN and firm registration number appear on the drawings. An architect or a professional engineer applies their seal where their involvement is required.
These are different things and they are not interchangeable. A BCIN identifies a registered designer. It is not a seal of approval, and it does not make the drawings an engineer’s or an architect’s work. Knowing which your project actually needs avoids a late and expensive discovery.
8. Forgetting Supporting Documents
A permit application is usually more than drawings. Depending on the project it can include:
- Engineering drawings and reports for structural elements
- Energy efficiency compliance documentation
- A current property survey
- Conservation authority or other agency approvals
- Proof of insurance for the registered design firm
Check the full list for your municipality before you submit.
9. Not Checking Zoning First
Building permits and zoning are separate. Your project has to satisfy both. Common zoning problems:
- Exceeding permitted height
- Encroaching on required setbacks
- Exceeding lot coverage
- A use that is not permitted in the zone
Check zoning before detailed drawings are produced. Discovering a setback problem after the drawings are finished means redrawing them. A minor variance, where one is available, adds months.

10. Not Talking to the Building Department
Engaging late is a reliable way to be surprised. Before you submit:
- Ask whether a pre-application conversation is available
- Ask how the department interprets provisions that affect your project
- Confirm submission format and how revisions are handled
- Ask what commonly causes comments on projects like yours
Plan examiners generally answer specific, well-prepared questions. They cannot design the project for you.
How to Avoid Most of This
Nearly every item above comes down to the same thing: submit a complete, accurate, internally consistent application that shows compliance rather than asserting it.
The hidden costs of getting it wrong are real: revision cycles, contractor downtime, lost season, re-application fees. Weighed against those, preparing the set properly the first time is usually the cheaper route.
To be clear about what anyone can promise: no designer can guarantee a permit. The municipality reviews every application and makes the decision. What good drawings do is remove the avoidable reasons for refusal. At Neo-Scenic Designs, reasonable drawing revisions arising from municipal review are included in our scope.
Next Steps
For a straightforward deck or a simple basement, preparing your own drawings may be realistic. For structural work, additions or anything with a zoning complication, it is usually worth bringing in help early.
Contact Neo-Scenic Designs to talk about your project. We are a registered design firm, BCIN 206160, preparing permit drawings for houses and small buildings across southwestern Ontario.
Common questions
What happens after the permit application is submitted?
The municipality reviews the application. If the reviewer has comments or asks for changes to the drawings, reasonable revisions arising from municipal review are included in our scope. The municipality decides whether to issue the permit, and the review time is set by the municipality. See our design and permit process.
How many revisions are included?
Preliminary design typically includes up to three rounds of revisions. Changes after you approve the concept may involve additional fees. Reasonable drawing revisions arising from municipal review are included in our scope. Changes to the project scope, and services outside it, are quoted separately.
Can you guarantee my permit will be approved?
No. The municipality reviews every application and makes the decision. We prepare the drawings for your project, and reasonable drawing revisions arising from municipal review are included in our scope.
What if the municipality asks for changes to existing work?
Physical corrections are the homeowner's responsibility to arrange and pay for. Minor drawing revisions after municipal review are generally included in our agreed scope. Major redesign, newly discovered deficiencies or additional services may need a separate quote.
Can you tell me whether my existing work will pass?
Not in advance. We can review what was built and advise whether preparing drawings for a permit application makes sense. The municipality may require finished work to be opened up, tested or changed, and it decides on the application.
Are the images on this website photographs of finished projects?
Some are, and the drawings are from real drawing sets. Two other kinds of image are not photographs of our work, and they differ from each other. The architectural visualizations are AI-enhanced images produced from Neo-Scenic Designs project models: finishes, materials, landscaping, furnishings and some architectural details in them are generated or interpreted by software, so they show what a project could look like rather than approved or completed construction. The illustrations on our articles are AI-generated editorial images: they are not based on any Neo-Scenic Designs project, drawing, client or site, and they show generic scenes chosen to suit the article. The building permit drawings remain the authoritative design documents, and photorealistic rendering is not a standard part of our services.